Completing the Network: Outer Huron Redesign
Completing the Network: Outer Huron Redesign
A short gap near Fresh Pond separates existing Cambridge bike facilities from planned connections in Belmont. We’re sharing information about the project, growing bicycle use, and what the available parking and traffic data show.
The short version
The Outer Huron project covers only a short stretch of Huron Avenue between Fresh Pond and Grove Street, but it sits at an important junction in the regional walking and bicycling network. The preferred design connects separated bike facilities to the Belmont line, improves the Grove Street intersection, updates two important pedestrian crossings, and addresses very common speeding along the corridor.
The project also changes curb use. The City has responded by prioritizing important access needs, maintaining accessible loading spaces for the Russell Youth Center, adding disability access spaces and other parking on the same side of the road as the Youth Center and the VFW, maintaining the existing bus stop, and making better use of the existing spaces by requiring that they are used for resident permit parking overnight. Cutting down on illegal parking within the golf course and adding meters near the golf course during the day will help ensure that there is sufficient room for golf users on busy days as the project moves forward.
~¼ mile
The remaining gap between Cambridge’s Huron Avenue facilities and planned Grove Street bike lanes in Belmont.
35+ mph
City data shows that 15% of drivers travel at over 35 mph, a speed that can be fatal for a pedestrian or cyclist.
Spring 2027
The City’s current target for installation, following public meetings and final feedback on the preferred design.
Parking management is part of the solution. Options to improve parking management include short-term loading, accessible spaces, requiring residential permits for evening and overnight use, meters to ensure a sufficient number of spaces for daytime access, better use of existing off-street capacity, and management of the golf-course lot so limited spaces remain available for people using the course.
A small gap with a regional role
Cambridge already has separated bike lanes farther east on Huron Avenue, while Belmont is planning bike facilities on Grove Street. The Outer Huron project connects those pieces, creating a continuous route toward Fresh Pond and the broader Cambridge bicycle network.
The connection also serves nearby destinations including the Russell Youth Center, Glacken Field and Playground, Haggerty Preschool, Fresh Pond, and the Watertown-Cambridge Greenway.
The larger point is network continuity: a protected route is much more useful when people can move from one comfortable facility to the next without encountering an abrupt high-stress gap.
Improving safety for everyone on the roads
The existing street encourages speeds well above the 25 mph limit. According to electronically recorded speed data collected by the City, 15% of drivers travel faster than 35 mph eastbound and faster than 33 mph westbound. Those speeds affect all users along the corridor, especially at crossings and intersections.
The Grove Street intersection is a central part of the project. The preferred design creates a tighter right turn, a larger pedestrian waiting area, improved bike connections, and coordinated crossing improvements with Belmont’s planned Grove Street work.


Biking is growing as the network connects
The Bluebikes station directly in front of Parkside Place sits where the new bike lane will begin. Trips starting or ending at that station increased from 3,799 in 2023 to 6,574 in 2025, a 73% increase. That is 2,775 more trips in a year at this one station.
That growth coincided with new connections nearby: the Brattle Street bike lanes in 2023, completion of the Huron Avenue/Glacken Field bike path in 2024, and Aberdeen Avenue improvements in 2025. The station data show growing use as the network expanded.

Bluebikes trips starting or ending at the Parkside Place station, 700 Huron Avenue. The comparison uses the full calendar years 2023 and 2025 and counts individual bike trips.
A connection to groceries and transit. An analysis of the station pairings shows that the Watertown Star Market station as Parkside’s strongest link, with increased trips between the stations from 2023 to 2025. Riders may be shopping for groceries or connecting to the 71 and 73 buses toward Harvard Square. Completing Outer Huron would extend the connected network west from a station people are already using more.
What about parking and access?
Parking is the main tradeoff raised around the project. A professional parking analysis submitted for Parkside Place’s BZA application helps put the discussion in context.
Prioritize the curb for access
The preferred design moves parking and loading closer to the Russell Youth Center, including space that can serve families, caregivers, staff, visitors, and people who need accessible access.
The bus stop remains
The existing stop is maintained, a clear preference from those attending meetings, preserving an important connection for youth-center programs and nearby residents who rely on transit.

Many Parkside households do not own cars
The study estimated that 30-40% of Parkside households had no car. Their access needs deserve attention too: safe crossings, reliable transit access, and connected bike routes make it easier to get around without owning a car.
Most resident cars already use the garage
The July 2021 survey identified 21 cars across 16 households without garage rentals, and 41 cars in 2020. The study assumed these cars parked on Huron Avenue.

Source: TrafInfo, for Parkside Place’s application to the Board of Zoning Appeal. Household and garage figures: PDF pages 11–12; curb counts: page 17. The study does not break down car ownership by income. Updated counts would help guide implementation. View the underlying BZA documents.
The garage had substantial unused capacity
In July 2021, 146 of 232 garage spaces were rented; 86 were vacant. Parkside sought permission to convert 32 spaces into community outdoor space.
On-street spaces were not close to full
Across four observations between Grove and Holworthy Streets, approximately 51-60 of 116 curb spaces were unoccupied, excluding loading spaces. This included a summer weekend midday count.
Affordability and access need practical solutions. Garage spaces carry a separate rental charge. The City should work to preserve curb spaces for accessibility, loading, and residents who rely on this parking who cannot afford garage spaces. Protecting lower-income residents also means making walking, biking, and reaching the bus safer.
Where the project stands
The City has published its preferred design and is gathering final feedback, with installation currently planned for spring 2027.
We support moving forward, as this project closes an important and short gap in the regional network, addresses speeding and crossing conditions, and can preserve the access people need through better use and management of the curb and nearby parking supply.

